ai
  • Crypto News
  • Ai
  • eSports
  • Bitcoin
  • Ethereum
  • Blockchain
Home»Ai»2025 Climate Tech Companies to Watch: Kairos Power and its next-generation nuclear reactors
Ai

2025 Climate Tech Companies to Watch: Kairos Power and its next-generation nuclear reactors

Share
Facebook Twitter LinkedIn Pinterest Email

Furthermore, Russia’s invasion of Ukraine in 2022 slammed the doors on supplies of Russian uranium, including the fuel with a higher concentration of uranium-235 that’s needed to make the pellets for Kairos’s efficient reactors. The US and Europe have since been scrambling to mobilize domestic production, but the process will take years. In the meantime, the DOE has agreed to supply Kairos and a few other US companies developing similar reactors with limited quantities of the specialized uranium for their near-term fuel needs. 

Even with a regular supply, transporting that uranium to reactors won’t be straightforward. There isn’t yet a special container approved by the US Nuclear Regulatory Commission that could move it in any significant volume, and using existing containers could take thousands of shipments to fuel a single reactor. Kairos has said that it could potentially use a less enriched type of uranium to prove its technology’s viability while the supply of its desired version is tight. 

Next steps

Kairos is now building three reactors simultaneously —two non-nuclear test units to validate its systems, and the Hermes experimental nuclear reactor. These facilities will prove the molten salt technology at full scale, without generating any usable power. Kairos will soon start work on another, Hermes 2, which will be the company’s first system to produce electricity. 

When that 50-megawatt reactor comes online in 2030, Kairos will sell its power to the Tennessee Valley Authority, the US’s largest public power provider, and the associated clean energy credits to Google. Google has agreed to purchase up to 500 megawatts of generation capacity from Kairos by 2035 to help decarbonize its data centers. But take all those dates with a pinch of molten salt—nuclear power stations usually come in late and over budget. 

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email

Related Posts

StreamTensor: A PyTorch-to-Accelerator Compiler that Streams LLM Intermediates Across FPGA Dataflows

octobre 6, 2025

A Coding Implementation to Build a Transformer-Based Regression Language Model to Predict Continuous Values from Text

octobre 5, 2025

This AI Paper Proposes a Novel Dual-Branch Encoder-Decoder Architecture for Unsupervised Speech Enhancement (SE)

octobre 5, 2025

How to Evaluate Voice Agents in 2025: Beyond Automatic Speech Recognition (ASR) and Word Error Rate (WER) to Task Success, Barge-In, and Hallucination-Under-Noise

octobre 5, 2025
Add A Comment

Comments are closed.

Top Posts

SwissCryptoDaily.ch delivers the latest cryptocurrency news, market insights, and expert analysis. Stay informed with daily updates from the world of blockchain and digital assets.

We're social. Connect with us:

Facebook X (Twitter) Instagram Pinterest YouTube
Top Insights

Red Bull League of Its Own 2025 to feature T1, Los Ratones and more at Munich Showcase event

octobre 6, 2025

Mayor Richard Parker Interview: West Midlands’ esports ambitions and beyond

octobre 6, 2025

Korean Retail Capital Bolstering ETH Price, Ether Treasuries: Samson Mow

octobre 6, 2025
Get Informed

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Facebook X (Twitter) Instagram Pinterest
  • About us
  • Get In Touch
  • Cookies Policy
  • Privacy-Policy
  • Terms and Conditions
© 2025 Swisscryptodaily.ch.

Type above and press Enter to search. Press Esc to cancel.